Stefan Zeppetzauer

Selbstständig, Teamlead/Senior Consultant SAP Planning/PP/PM, Freelance

Ebensee am Traunsee, Österreich

Fähigkeiten und Kenntnisse

>>> Implementation Know-How <<< Design and Fit-Gap
Developments
Testing
Data Migration
Trainings; Cut-Over
Go-Live Support and Hypercare >>> SAP PP <<< Sa
Demand Management
Long-Term Planning; Material Requirements Planning
Engineering Workbench; Engineering Change Manageme
Work Orders; Break-Down Maintenance; Corrective-/P
Inventory Management); SAP SD (Sales
Pricing
Transport)

Werdegang

Berufserfahrung von Stefan Zeppetzauer

  • Bis heute 16 Jahre und 8 Monate, seit Nov. 2007

    Teamlead/Senior Consultant SAP Planning/PP/PM

    Freelance

  • 1 Jahr und 4 Monate, Okt. 2010 - Jan. 2012

    Streamlead SAP PP/PM

    Iglo Foods Group Limited

    Business Integration and Full Life-Cycle SAP Implementation due to Iglo’s expansion to Italy (Findus Italy). SAP PP: Workshops, fit/gap-Analysis, detailed process design and functional specifications; Master data; Engineering change management; Discrete manufacturing; MRP; Integration to APO; Testing; Data migration; Cut-over; Go-live support. SAP PM: Fit/Gap-Analysis. Optimizations post go-live (from Oct. 2011): Alignment of business processes in SAP PP across 5 factories; product costing.

  • 1 Jahr und 8 Monate, Jan. 2009 - Aug. 2010

    Lead Consultant SAP PP

    Cinram GmbH

    Business process re-engineering and optimization of SAP production planning, manufacturing, integration to shop floor/manufacturing execution system and prod-uct set-up. Replacement of highly custom-developed solution by best practice processes and SAP standard functionality. Reengineering of cross-departmental product set up process. Design of change management concept and adaptation of organizational structure according to process changes.

  • 1 Jahr und 1 Monat, Nov. 2007 - Nov. 2008

    Teamlead APO/PP/PM

    Birdseye Iglo Group ltd. (London, UK)

    Business separation and full life-cycle SAP implementation plus role-outs to 8 countries; full R/3+APO+BI+XI+80 non-SAP apps+700 RICEFs. Multi-cultural team of 160 consultants onsite&offshore. My Role: Team management of 15 onsite and off-shore consultants; full delivery responsibility for SAP and non-SAP apps, interfaces; data migration; functional consulting PP (detailed process design (discrete manufacturing, MRP, functional specifications and interfaces, config., testing, DM, go-live support)

  • 1 Jahr und 8 Monate, Apr. 2006 - Nov. 2007

    Senior Consultant SAP PP/PM/Logistics

    IDS-Scheer AG

    SAP consulting with focus on PM/PP; several full life-cycle implementations on international SAP projects; teamlead roles in multi-cultural teams.

  • 1 Jahr und 1 Monat, Okt. 2006 - Okt. 2007

    Lead Consultant SAP PM/PP

    PepsiCo (Cairo, Egypt)

    Full life-cycle ECC6 SAP implementation; development of regional template for Middle East plus subsequent role-outs into the region. The project was part of a global SAP implementation which was supported by a global delivery team in India. Consultancy: IDS-Scheer AG; Location: Cairo, Egypt. SAP PM (full scope PM; design of global SAP PM template); SAP PP (SOP, demand management, long-term planning, DRP, MRP, repetitive manufacturing; development and set-up of prototype for MEA; prep. for KSA )

  • 1 Jahr und 9 Monate, Apr. 2004 - Dez. 2005

    SAP Consultant Logistics (focus on PM and PP)

    applied international informatics AG

    SAP consulting with focus on PM/PP; several full life-cycle implementations (blueprint, configuration, testing, training, developments (ABAP) and data migration (LSMW).

  • 2 Jahre und 10 Monate, Juli 2001 - Apr. 2004

    In-house Consultant SAP PM/MM

    UPM-Kymmene Austria GmbH

    Full life-cycle SAP PM implementation +plus Business Process Optimization Project in Steyrermühl, Austria. Project language English/German. My responsibilities: Conceptional design, data migration, trainings, implementation of SAP PM; Design of add-ons for shut-down planning, resource planning, spare parts withdrawal, PM order approval; Project “Optimi

Ausbildung von Stefan Zeppetzauer

  • 8 Jahre, Okt. 1995 - Sep. 2003

    Mechanical Engineering combined with Economics

    University of Technology Graz

    Master thesis: Optimization of Maintenance Processes by SAP R/3 PM

  • 4 Jahre und 10 Monate, Sep. 1990 - Juni 1995

    Mechanical Engineering

    Technical High School Vöcklabruck

Sprachen

  • Deutsch

    Muttersprache

  • Englisch

    Fließend

21 Mio. XING Mitglieder, von A bis Z