Mag. Nadezhda Pokryshko
Bis 2020, Incoming Control Inspector, BT Group
Moscow, Russische Föderation
Werdegang
Berufserfahrung von Nadezhda Pokryshko
Bis heute 3 Jahre und 10 Monate, seit Sep. 2020
Lead QC engineer
China CAMC engineering co. Ltd.
1 Jahr und 10 Monate, Nov. 2018 - Aug. 2020
Incoming Control Inspector
BT Group
Quality control of products (static and rotating equipment; HVAC); Monitoring of receiving material at the warehouse for calling inspections; Verification of accompanying documentation; Work with material take-off and design drawings, checking in the tecnical passports and quality sertificates for material and equipment; Control of quality compliance and completeness of static and rotating equipment, HVAC systems to KMD drawings, bill of materials and technical documentation
7 Monate, Mai 2018 - Nov. 2018
Lead QC Engineer
I-Teco JSC
• Visual inspection of Electric equipment for Telecommunications; • Preparation as-built documentation and filling in the Incoming control Log; • Check in the Bills of Quantity with the approved design documentation; • Collaboration with Customer Supervisors. Works in the project: «Re-construction (device) of the multifunctional complex with underground parking» (Evolution Tower, Moscow-City)
1 Jahr und 9 Monate, Sep. 2016 - Mai 2018
QC Engineer
Zapolyarpromgrazhdanstroy, LLC
• Works with Russian and international codes and standarts (GOST, SNIP, ASME, API); • Preparation as-built documentation (Acts of incoming control for process piping, valves, welding materials); • Check and control preparation of as-built documentation; • Check material certificates for completeness and equipment for compliance with specifications and design • Сarry out the procedure of the incoming inspection of materials and equipment
11 Monate, Aug. 2015 - Juni 2016
Lead As-Built Engineer
MorGasService, LLC
* Working with Russian technical codes and standarts; * Review of design documentation; * Development operating process charts; * Preparation and check out of as-built documentation; * Interaction with Customer’s Supervision department; * Control of performance construction schedule; * Business correspondence with Subcontractors.
1 Jahr und 2 Monate, Juli 2014 - Aug. 2015
Design Supervisor
Swiss Engineering Group, LLC
• Analysys design documentation presented by contractors and subcontractors; • Control of design documentation (field pipelines linear part); • Control of incoming technical design documentation for compliance to Uzbekistan standards and international standards; • Verification of quantities bills, materials data sheet and equipment; • Preparing daily and weekly reports and providing the information to Customer's Manager.
1 Jahr und 3 Monate, Mai 2013 - Juli 2014
Lead Engineer of Pipelines sector
SGK-Truboprovodstroy-5, LLC
• Analysis of the project and pipeline operational documentation (long distance and field pipelines linear part); • Verification volume of project works and services; • Preparing executive documentation for add-on construction-and-assembling operations including KS-2, KS-3, M-29 forms; • Interaction with Customers, General Designers and Subcontractors.
9 Monate, Aug. 2012 - Apr. 2013
Design Pipeline Engineer
VNIIST, JSC
• Design of the linear part oil and gas field pipelines; • EDM development, pipeline right-of-way (the ROW project); • Initial data collection for the development of design documentation; • Interaction with equipment and materials Suppliers and Vendors; approving equipment and materials with the Customer; • Interaction with Project groups; • Settings the tasks for joint design groups.
1 Jahr und 2 Monate, Juli 2011 - Aug. 2012
Lead As Buit Documentation Engineer
LENGAZSPETSSTROY, JSC
* Forming set of permit documentation for construction; * Working with technical documentation standards; * Analysis and verification of design estimate documentation; * Drawing up technological and pipeline schemes; * Business correspondence with the Customer, General Contractor and Subcontractors; * Preparing executive documentation for add-on construction-and-assembling operations including KS-2, KS-3, M-29 forms; * Interaction with Drill Blust Engineers; * Archiving.
2 Monate, Apr. 2011 - Mai 2011
Engineer
GIPRONIIGAZ, JSC
* Preparing design documentation for loading pipeline
5 Jahre und 6 Monate, Okt. 2005 - März 2011
Pipeline Design Engineer
Gazprom designing
* Design of the linear part of gas pipelines; * Development volume of project works and services; * EDM development; * Getting of pipeline projects approval from utilities Owners (Pipeline’s crossing with cables, oil, gas and water pipelines, electric power lines, etc.).
Ausbildung von Nadezhda Pokryshko
4 Jahre und 10 Monate, Sep. 2000 - Juni 2005
Design, construction and exploitation oil & gas pipelines
Lomonosov Northern (Arctic) Federal University, Arkhangelsk
Sprachen
Englisch
Gut
Spanisch
Grundlagen
Russisch
Muttersprache